Products >> The introduce of Industrial natural gas fired steam boiler syst

The introduce of Industrial natural gas fired steam boiler syst

Build Your Online Product Catalogs?



Description
Product Name: The introduce of Industrial natural gas fired steam boiler syst
Supply Ability: 10 million dollar
Related proudcts
Specifications 1.Capacity:1ton/hr~50ton/hr 2.Pressure:1MPa~3.8MPa 3.Thermal e
Price Term: FOB
Port of loading: Shanghai or Qingdao
Minimum Order 1 set
Unit Price: 35000 $


In order to ensure safe and economic operation of the boiler, ensure the personal safety, boiler operating personnel must strictly carry out the relevant regulations and procedures of steam boiler safety technology supervision.
The Preparation of before Start oil and gas boiler:
Internal and external inspection: confirm the boiler body, burning machine, accessory equipment in good condition; safety accessories, each valves and instrument are flexible and stayed accurate location.
Check the line voltage reach the requirements or not, all kinds of switch is normal, start the pump, combustion engine fan, pumps and other auxiliary respectively to see operation is normal or not.
Feed water into boiler: open the drain valve to make the water level up to the normal water level(slightly below the water level)
Begin to Operate:
Oil and gas boiler is the program to start. Press the start button on the control ark and the combustion engine fan motor begin the programmed-start. First step is furnace purging about 2 minutes and then automatic ignition and stable combustion.
After the ignition, the worker should adjust combustion according to the required amount of load and them boiler operates normally.
The operator should monitor the water level change closely in the process of operation to prevent water shortage accident or filled with water accident.
Boosting Pressure:
When the steam pressure rises to 0.05-0.1***, worker should flush water gauge.
When the steam pressure rise to 0.1-0.15***, worker should flush the trap tube of pressure gauge.
When steam pressure rises to the rated working pressure, the newly installed boiler safely valve and the relief valve after repaired should be debugging in accordance with the relevant provisions and seal. The relief valve during the validity period of maintenance should take discharge test.
Warm Tube and Make two Boilers Work Together:
In order to prevent the steam supply producing water hammer, warm tube should be done before steam supply, it will take when s

Contact Us
Company: Xinda boiler container Co.,Ltd
Contact: Mr. Adam Wang
Address: The south of Jinsui Road
Postcode:
Tel: 86 373 2511868
Fax: 86 373 5591968
E-mail:         


Copyright© Xinda boiler container Co.,Ltd All Rights Reserved.
Tel : 86 373 2511868 Fax : 86 373 5591968
Powered by 86exporter.com