86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


Xinda boiler container Co.,Ltd

Products >> China Autoclaved cellular concrete blocks professional Manufactu

China Autoclaved cellular concrete blocks professional Manufactu

Build Your Online Product Catalogs?



Description
Product Name: China Autoclaved cellular concrete blocks professional Manufactu
Supply Ability: 10 million dollar
Related proudcts construction machine, autoclaved kettle,
Specifications autoclaved aerated concrete block price 1 Adopt Germany technol
Price Term: FOB
Port of loading: Shanghai or Qingdao
Minimum Order 1
Unit Price: 20000$

Reaction caldron in the aeroconcrete shall ensure safety attachments are complete, sensitive, reliable and fixed-point and alignment for tours of inspection in the runtime. When you find the AAC autoclaved device has abnormal phenomenon, you should antihypertensive treatment in a timely manner.
You should close the inlet valve, drain valve and valve a1,a2,a3
exposed surface of closed loop coated with the lubrication of graphite powder.
Close the kettle cover device, shake speed reducer and turn the pot cover to make the kettle body flange completely meshing teeth, besides turn the safety handle to horizontal position to lock the kettle cover.
Open the valve a1 and a3 to bubble into main steam to seal pot cover face.
Open the inlet valve until to reach working pressure, then open the valve a2 and close valve a3, rely on the steam within kettle body to seal itself
After the autoclaved has been completed, we should open the drain valve, only when the pressure gauge indication is zero, the safety handle allow to rotate vertical position, the rest gas in the kettle excluded by a ball valve. Then shake speed reducer, when the kettle cover flange junction rotate to meshing steps, we should slow down as far as possible until the concave tooth and the kettle body flange stop running. The kettle cover face has been apart with the seal ring, we will back kettle cover to the inside kettle body. In the process of the kettle lid opening , the operator should be located in the kettle cover on the right side, no one shall be located at the front of kettle lid.
We should be slow when switch kettle cover and car in and out of the kettle body to avid break the kettle body.
In the process of booster and regulator pressure, we should constantly monitor the condensed water, when the water level of kettle body become low and close the water level alarm, the automatic displacement of water device is not enough, we need to open the drain valve to drainage manually. When the temperature distance reach to 40 DHS between the upper a

Contact Us
Company: Xinda boiler container Co.,Ltd
Contact: Mr. Adam Wang
Address: The south of Jinsui Road
Postcode:
Tel: 86 373 2511868
Fax: 86 373 5591968
E-mail:         


Copyright© Xinda boiler container Co.,Ltd All Rights Reserved.
Tel : 86 373 2511868 Fax : 86 373 5591968
Powered by 86exporter.com